The fashion
production wiki

Plain answers for getting clothes made: tech packs, MOQs, manufacturers, software and merch.
Flat lay of a fabric swatch book, folded t-shirts, a notebook, a violet tape measure, a lime swing tag, eyelets and a blank label.

What is MOQ in clothing manufacturing?

MOQ (minimum order quantity) is the smallest run a factory will make of one style. It's usually counted per style and per colour, not per order. At a 50-piece minimum, one hoodie in three colours is 150 pieces.

Three minimums sit behind the number

  • Fabric

    Mills sell cloth per colour, often a roll of around 100 metres. That is usually the real floor, not the sewing line.

  • Sewing line

    Setting up a line for one style only pays over a run. This is normally the smallest of the three.

  • Trims

    Custom labels, zips and tapes have their own makers and their own minimums, often higher than the cloth's.

What's typical for a small batch

Published UK minimums run from 1 to around 100 pieces per style. Hook and Eye UK, for example, starts at 50 per design and colour, and asks for at least two designs.

How to get under a minimum

  • Launch in fewer colours. Each colour is its own run.
  • Use stock fabric in stock colours, so the mill's minimum isn't yours.
  • Cut several styles from one cloth in one colour to fill a single dye lot.

Sources: Hook and Eye UK, VeriMills, UK Clothing Factory, SourceLink. Minimums vary by factory, so confirm yours on the quote.

Find a low-MOQ manufacturer

Production terms, in plain words

The words factories use on quotes, specs and samples, and where each one shows up in your production.

Tech pack
The document a factory quotes, samples and checks your garment against: flats, materials, measurements, construction and labels.How to make a tech pack
Bill of materials (BOM)
Every component in the garment, from fabric and thread to labels and bags, with its spec, colour and supplier reference.Listing materials
Point of measure
The exact place the tape goes, such as chest width 1 in below the armhole.Setting measurements
Tolerance
How far a measurement can be off and still pass, such as ±1 cm on a chest.Setting tolerances
Grading
The rules for how each measurement changes from one size to the next.Grading the size run
Sample
A test garment made before bulk. Rounds often run from a first proto through fit samples to a pre-production sample.
CMT (cut, make, trim)
The factory cuts and sews. You supply the fabric and trims, or pay for them separately.What a producer handles
Full package
The factory sources the materials and makes the garment, so you pay one price per piece.What a producer handles
Lead time
The time from order to finished goods, including fabric, sampling and production.
Landed cost
What one piece costs once it reaches you: unit price plus freight, duties and fees.
Pre-shipment inspection
A quality check on finished goods before they leave the factory, against your tech pack and tolerances.
Knowledge Library
Longer reads on overproduction, stock and smarter production
Apr 22nd, 2026
13
min read
Overproduction: The Fashion Industry's Dirty Secret
Christabel Achu
•
Fashion Technology Consultant
Read
Mar 27th, 2026
5
min read
Fashion SMEs do not need more inventory. They need better signals.
Vinchy Chan
•
Founder
Read
Guide
8 min read
What does a clothes producer actually do?
makea • Production workflow
Read

Questions about makea

The same answers as our FAQ page, grouped by topic.

The production OS for fashion brands. Its memory automates every production run, smarter each time.

Neither. It is a production operating system. You get supplier access, a clear workflow, and embedded supply chain knowledge, while staying in control.

Fashion SMEs who want to grow without building a large ops team, and teams producing creative fashion merch who need flexible production with clear visibility.

Every fit, fabric, quote and QC call is saved with its reason. Each run starts where the last ended, so you never pay to relearn what you already knew.

Your first run is built from scratch. On the second, specs and supplier carry over. By the third, specs, supplier and costs carry over too. Every run makes the next one faster and smarter.

Their know-how stays. Fit fixes, supplier contacts and cost calls live in makea, not in one person's inbox or WhatsApp. The next hire picks up where they left off instead of starting blind.

Yes. Your knowledge moves with you, so you can pick factories on merit and switch in weeks.

A PLM or ERP stores files, not why they changed, and someone still has to type everything in. makea saves every decision with its reason as the work happens, so your next run learns and goes faster.

6 hours saved per tech pack, 5× faster from quote to approved sample, 30% less cash tied up in bulk and up to 60% OPEX saving. One brand saved £30K on hiring; another went from 8 hours to 1 per tech pack.

Make every run smarter than the last.

No seat fees. Your whole team is included.

  • Cream smocked midi dress
    InesRemembered

    Holidays in every planning date

  • Green gingham tie-neck blouse
    MarlowRemembered

    Fit notes from a similar style

  • Sage check wide-leg trousers
    SorrelRemembered

    Shrinkage test first

  • White floral print t-shirt
    JunoRemembered

    Print guideline in bill of process